Difference between revisions of "July 17, 2009 CDC Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
 
Line 25: Line 25:
 
* Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
 
* Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
 
* CMU to look over to see if piece tolerances can be loosened to ± .001 in
 
* CMU to look over to see if piece tolerances can be loosened to ± .001 in
 +
** <font color=blue> These are ok for hole position. We had tightened them for gluing purposes.</font>
 
* OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
 
* OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
 
* Conductive rubber tubes cover 30% of gas holes - ok
 
* Conductive rubber tubes cover 30% of gas holes - ok
 
* Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
 
* Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
 
* CMU to send list of glues
 
* CMU to send list of glues
 +
** <font color=blue>Silver Epoxy: Tra-Con TRA-DUCT 2929</font>
 +
** <font color=blue>Scotchweld 190 & 270</font>
 
* JLAB to specify glue for rohacel to mylar joint
 
* JLAB to specify glue for rohacel to mylar joint
 
 
 
 
  
 
== Notes ==
 
== Notes ==

Latest revision as of 10:00, 22 July 2009

Meeting Time and Place

Friday July 17, 2009 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 428

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")

Agenda

  1. CDC Hardware costs Costs

Minutes

  1. Action Items/Decisions
  • Discussed high prices for tight tolerance components
  • Checked IDEAL tool and manufacturing in Chicago. No listing
  • Tim to discuss with vendor repair of end plates if hole messed up
  • Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
  • CMU to look over to see if piece tolerances can be loosened to ± .001 in
    • These are ok for hole position. We had tightened them for gluing purposes.
  • OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
  • Conductive rubber tubes cover 30% of gas holes - ok
  • Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
  • CMU to send list of glues
    • Silver Epoxy: Tra-Con TRA-DUCT 2929
    • Scotchweld 190 & 270
  • JLAB to specify glue for rohacel to mylar joint

Notes