Difference between revisions of "July 15, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 18: Line 18:
 
# Announcements
 
# Announcements
 
# Optical box design update (MIT)
 
# Optical box design update (MIT)
#* Test setups at ODU and CUA (Greg)  
+
#* [https://userweb.jlab.org/~gkalicy/ODUandCUAsetups_Greg.pdf Test setups at ODU and CUA] (Greg)  
 
# Support structure design update (IU)
 
# Support structure design update (IU)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Revision as of 09:41, 15 July 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, July 1, 2016
1 pm, EDT
JLab room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box design update (MIT)
  3. Support structure design update (IU)
  4. Planning for FY16
  5. AOB