July 14, 2022

From GlueXWiki
Revision as of 20:06, 14 July 2022 by Boyu (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Connection details

Meeting minutes

  • Monitoring launch ver 06: TAGH, PS and FCAL remaining. May have to postpone the data cook to next week
  • Jackson and Tim had discussions about the SRC progress
  • Bhesha and Jackson had discussions on the cuts used for analysis
  • Bo and Bhesha had discussions on the TAGH calibrations