Difference between revisions of "January 9, 2018 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday January 9, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room...") |
(→Agenda) |
||
(7 intermediate revisions by 3 users not shown) | |||
Line 22: | Line 22: | ||
# Bar box transportation | # Bar box transportation | ||
#* Planning for final 3 bar boxes | #* Planning for final 3 bar boxes | ||
− | #** Monitoring System (John and Yunjie) | + | #** Bar box out of crate in Hall D [https://halldweb.jlab.org/wiki/index.php/File:IMG_2674.JPG]. Plans for crate shipment to IU. |
+ | #** Monitoring System (John and Yunjie) [https://halldweb.jlab.org/wiki/images/d/d5/ThreeBoxMonitoring010918.pdf Pricing for system][https://halldweb.jlab.org/wiki/images/8/8e/WSDA-200-USB_Datasheet_%288400-0103%29RevA-1.pdf new base station] | ||
#** Gas system (John) | #** Gas system (John) | ||
#** Temporary storage for bar boxes in the hall | #** Temporary storage for bar boxes in the hall | ||
Line 29: | Line 30: | ||
#* Design drawings and PMT mounting update (Ernie and Jason) | #* Design drawings and PMT mounting update (Ernie and Jason) | ||
#** Questions to drawing package: [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | #** Questions to drawing package: [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | ||
− | |||
− | |||
− | |||
− | |||
#*** The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true? | #*** The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true? | ||
+ | #**** Ernie: It is supposed to be a 2 mm weld, every 25 mm. Let me look at the drawing and see if there is a mistake. | ||
#*** What is the fillet weld size on the inside of frame (opposite the seam weld)? | #*** What is the fillet weld size on the inside of frame (opposite the seam weld)? | ||
− | #* Presentation on assembly sequence (Ernie and Jason) | + | #**** Ernie: We are going to review this one more time before we supply an answer. |
− | #* Simulation studies (Maria and Roman) | + | #* When should we expect to have a prototype of the “red bracket” to test the PMT mounting? |
− | # MAPMT testing (Bill) | + | #** This will help in coordinating travel and when we’ll need to loan you a PMT/electronics board module from JLab for these tests. |
+ | #* Presentation on assembly sequence (Ernie and Jason) [https://halldweb.jlab.org/wiki/index.php/File:20180109_Status_Update.pdf] | ||
+ | #* Simulation studies: [http://web-docs.gsi.de/~rdzhigad/www/research/hit-pattern hit patterns] (Maria and Roman) | ||
+ | # MAPMT testing (Justin and Bill) | ||
# AOB | # AOB |
Latest revision as of 14:21, 9 January 2018
Meeting Information
GlueX DIRC Meeting
Tuesday January 9, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time doodle poll
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation
- Planning for final 3 bar boxes
- Bar box out of crate in Hall D [2]. Plans for crate shipment to IU.
- Monitoring System (John and Yunjie) Pricing for systemnew base station
- Gas system (John)
- Temporary storage for bar boxes in the hall
- Dates to discuss with SLAC?
- Planning for final 3 bar boxes
- Optical box
- Design drawings and PMT mounting update (Ernie and Jason)
- Questions to drawing package: STEP file
- The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
- Ernie: It is supposed to be a 2 mm weld, every 25 mm. Let me look at the drawing and see if there is a mistake.
- What is the fillet weld size on the inside of frame (opposite the seam weld)?
- Ernie: We are going to review this one more time before we supply an answer.
- The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
- Questions to drawing package: STEP file
- When should we expect to have a prototype of the “red bracket” to test the PMT mounting?
- This will help in coordinating travel and when we’ll need to loan you a PMT/electronics board module from JLab for these tests.
- Presentation on assembly sequence (Ernie and Jason) [3]
- Simulation studies: hit patterns (Maria and Roman)
- Design drawings and PMT mounting update (Ernie and Jason)
- MAPMT testing (Justin and Bill)
- AOB