Difference between revisions of "January 22, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday January 22, 2019<br> 1:00 pm, EDT<br> JLab Hall D counting house <br> == Connection Using Bluejeans == # To join via...")
 
(Agenda)
 
Line 26: Line 26:
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
#* LED generator and timing calibration (Yunjie)
+
#* LED generator and timing calibration ([https://halldweb.jlab.org/wiki/images/a/ac/LED_update_012219.pdf Yunjie])
 
#* Time-based studies and adding # photons to LUT likelihood (Maria)
 
#* Time-based studies and adding # photons to LUT likelihood (Maria)
 
#* Alignment updates (Cris)
 
#* Alignment updates (Cris)

Latest revision as of 00:48, 22 January 2019

Meeting Information

GlueX DIRC Meeting
Monday January 22, 2019
1:00 pm, EDT
JLab Hall D counting house

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • New meeting time for Spring semester: Tuesdays at 1 pm
  2. Installation status (All)
    • Quartz window delivery, cleaning and installation (Greg)
    • PMT installation and optical coupling (Greg/Maria)
    • Optical box installation, survey, cabling and closure
    • Ongoing readout tests and preparations for LED runs
  3. Spring 2019 DIRC Commissioning (All)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • LED generator and timing calibration (Yunjie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • All software for commissioning now on master branch.
  5. Addressing ERR review recommendations
  6. AOB