Difference between revisions of "January 17, 2023 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 1: Line 1:
<font color=red>Meeting Day/Time: every 4th WEDNESDAY at 11:00 a.m. JLab time (monthly frequency during the long shutdown)</font>''<br>
+
<font color=red>Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time </font>''<br>
  
 
=Connection instructions=
 
=Connection instructions=
Line 47: Line 47:
  
 
= Minutes =
 
= Minutes =
''Attendees''
+
''Attendees: Igal, Sean, Jon, Malte, Eugene, Sasha, Zisis''
 +
 
 +
# Announcements: Zisis announced that the baby BCAL is now at ANL, on load from JLab for a period of a year.
 +
# Past Meeting Minutes: nothing to review.
 +
# Review Action Items: will review these at our next meeting. Igal noted that Ilya is at JLab now and will likely work on uploading the constants in the next week or so.
 +
# Detectors
 +
## FCAL/ECAL: Malte reported that FCAL2 lead glass has all HV and signal cables installed. All 4 plexiglas panels are installed, two have the LEDs on them.  The critical one was bottom left (as seen by the beam) as this needed to be completed for the ECAL LMS fibers to go on.
 +
## BCAL: Zisis reported that Regina will aim to complete the BCAL SiPM dark rate study during the summer.
 +
# Calibration
 +
## 2022-08 [https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_phase_3_(2022-08)_BCAL_pi0_calibration BCAL done] & [https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_phase3_FCAL_time/energy_calibrations FCAL done]
 +
## 2023-01 [https://halldweb.jlab.org/wiki/index.php/GlueX_phase_2_(2023-01)_BCAL_pi0_calibration BCAL done] & [https://halldweb.jlab.org/wiki/index.php/GlueX_phase_2,_2023-01_data_set FCAL timing & gains done]
 +
# Monitoring
 +
# Reconstruction
 +
# Simulations
 +
# Any other business

Revision as of 18:35, 18 January 2024

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Connect to ZoomGov Meetings

References

  1. FCAL HDFCAL log book
  2. ECAL HDECAL log book
  3. BCAL HDBCAL log book
  4. CCAL HDCCAL log book
  5. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  6. Photon Reconstruction Task Force
  7. BCAL calibration links, 2020, PrimEx, SRC

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
  4. Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Review Action Items
  4. Detectors
    1. FCAL/ECAL
    2. BCAL
  5. Calibration
    1. 2022-08 BCAL done & FCAL done
    2. 2023-01 BCAL done & FCAL timing & gains done
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business

Minutes

Attendees: Igal, Sean, Jon, Malte, Eugene, Sasha, Zisis

  1. Announcements: Zisis announced that the baby BCAL is now at ANL, on load from JLab for a period of a year.
  2. Past Meeting Minutes: nothing to review.
  3. Review Action Items: will review these at our next meeting. Igal noted that Ilya is at JLab now and will likely work on uploading the constants in the next week or so.
  4. Detectors
    1. FCAL/ECAL: Malte reported that FCAL2 lead glass has all HV and signal cables installed. All 4 plexiglas panels are installed, two have the LEDs on them. The critical one was bottom left (as seen by the beam) as this needed to be completed for the ECAL LMS fibers to go on.
    2. BCAL: Zisis reported that Regina will aim to complete the BCAL SiPM dark rate study during the summer.
  5. Calibration
    1. 2022-08 BCAL done & FCAL done
    2. 2023-01 BCAL done & FCAL timing & gains done
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business