Difference between revisions of "January 12, 2009 Tracking CDC/FDC"
From GlueXWiki
Line 23: | Line 23: | ||
* Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config) | * Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config) | ||
+ | * FDC-CDC tracking studies [[Media:20090112_fdc_tracking.pdf|PDF]] | ||
* AOT | * AOT |
Revision as of 13:19, 12 January 2009
Meeting Time and Place
Monday January 12, 2008 at 1:30pm At Jefferson Lab, the meeting will be held in room F326
Connections
To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")
Agenda
- Announcements
- Status of FDC
- Status of CDC
- Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config)
- FDC-CDC tracking studies PDF
- AOT