Jan 27, 2011 Readout

From GlueXWiki
Revision as of 15:42, 27 January 2011 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 10:30 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM, JLab, Regina)
  2. Detailed schedule for testing at USM (Elton and Will). In progress

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Agenda for GlueX-Collaboration-Jan-2011
  4. BCAL Monitoring Update
  5. USM update
  6. SiPM update
    • Regina preparations
    • First Article testing (Carl and Yi)
  7. Simulations
  8. Electronics/cooling (Fernando)
  9. Geometry and light guides
  10. Comments on QC/QA from project (Elton)

Minutes

Attending: Christina, George, Pavlos (Athens); Zisis, Andrei (UofR); Elton, Beni, Eugene, John, Jim, Tim, Yi, Chuck, Fernando (JLab)

  1. Announcements
    1. Elton: JLab is rolling out a new phone conferencing system. New access codes and procedures should be updated on communication documents. Presently both new and old systems are active.
  2. Review of Action Items
  3. Agenda for GlueX-Collaboration-Jan-2011
    1. Agenda on the wiki was confirmed. Will should send me several slides about the USM work to include into the Readout talk and Christina and Zisis should send me slides for the monitoring talk.
  4. BCAL Monitoring Update
    1. Zisis updated the group on ongoing discussions between Zisis, Christina and Elton. A summary talk will be given at the collaboration meeting.
    2. The present scheme will have individual LEDs on each light guide connected via electrical cables to a driver board outside the readout enclosure.
    3. Outstanding issue: concern that many LEDs result in many points of failure and we need redundancy. A system is envisioned that will allow sensors on each side of the calorimeter to be seen by both BCAL ends (although with different LED settings).
    4. Calibration will be accomplished with pi0's on a daily basis. The monitoring system will check drifting during this period.
    5. Eugene: Should check with Ashot, which had experience with LED system for PRIMEX.
    6. Need to take a decision over the next couple of months on how to proceed.
    7. John inquired about the length of cable from LED to driver: George: Less than 3 m.
    8. Christina stressed that it is very important to make a decision so that the Athens group can move forward with construction.
  5. USM update (Will)
    1. Entering a phase for definition/closure of the contract for purchase and testing of SiPMs
    2. Beginning contacts with Hamamatsu
    3. Decision to test 32 SiPMs at a time in order to keep pace with Hamamatsu deliveries
    4. The testing box is being expanded from 16 to 32, but is modular and could be enlarged even more.
    5. The testing box is under construction now
    6. Working on version II of the electronic boards, which have been sent out for fabrication
    7. The latest design has a daughter board mounted on a mother board
    8. Progress on issues with customs. Francisco Soto, business manager, has been working with customs issues. It appears that tariffs for these items will be proportional to time spent in Chile at about 1%/month. The MOU has been useful for this purpose. [Note: there is no problem using the MOU as it is a public document].
    9. Progress on light guides: New diamond polishing bits have been purchased to see if they can produce an adequate finish. Using the 2 prototype light guides, can produce 4 guides per day.
  6. SiPM update
    • Regina preparations
    • First Article testing (Carl and Yi)
  7. Simulations
  8. Electronics/cooling (Fernando)
  9. Geometry and light guides
  10. Comments on QC/QA from project (Elton)