Difference between revisions of "JEF meeting, October 28, 2022"
From GlueXWiki
(→Minutes) |
|||
Line 28: | Line 28: | ||
* Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 35 crystals are available, expect to receive 50 more in November. | * Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 35 crystals are available, expect to receive 50 more in November. | ||
* Fabricated 10 more modules, the grand total is 1313 | * Fabricated 10 more modules, the grand total is 1313 | ||
− | * Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during FCAL2 installation phase. | + | * Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase. |
* We had a regular meeting with Tim's group on Wednesday this week. Discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting). | * We had a regular meeting with Tim's group on Wednesday this week. Discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting). |
Revision as of 11:35, 28 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Moving JEF hardware reports to CALWG?
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
- Wrapped CRYTUR crystals: 727
- Available for wrapping: 762 - 727 = 25 (10 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1313 (10 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 737 CRYTUR, available: 25
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak
Minutes
- 25 CRYTUR crystals have be ordered (the PR signed)
- Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 35 crystals are available, expect to receive 50 more in November.
- Fabricated 10 more modules, the grand total is 1313
- Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
- We had a regular meeting with Tim's group on Wednesday this week. Discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting).