Difference between revisions of "JEF meeting, October 14, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 8: Line 8:
 
* Preparation of parts for FCAL2 modules -- Sasha  
 
* Preparation of parts for FCAL2 modules -- Sasha  
 
** Prepare to order 25 CRYTUR crystals
 
** Prepare to order 25 CRYTUR crystals
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 717 (10 since last week) ]  
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 (10 since last week) ]  
*** Available for wrapping: 762 - 717 = 45
+
*** Available for wrapping: 762 - 727 = 35
 
*** DSG group continues wrapping
 
*** DSG group continues wrapping
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]

Revision as of 08:49, 14 October 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda