* Simulations/Analysis | * Simulations/Analysis | ||
** Photon reconstruction (Azizah) | ** Photon reconstruction (Azizah) | ||
+ | |||
+ | Preparation of parts for FCAL2 modules -- Sasha | ||
+ | ** Received 25 CRYTUR crystals [https://halldweb.jlab.org/wiki/index.php/CRYTUR] | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 ] | ||
+ | *** Available for wrapping: 762 - 727 = 25 (10 crystals were wrapped during last week) | ||
+ | *** DSG group continues wrapping (Mindy) | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
+ | * Module fabrication -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1313 </span> (10 modules fabricated since last week) | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 737 CRYTUR], available: 25 | ||
+ | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/October_26,_2022_FCAL_Insert_Cable_Installation_Meeting October 26] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ||
+ | * Light Monitoring System -- Arshak | ||
+ | |||
+ | |||
+ | |||
+ | |||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
* Updates from the FCAL installation meetings with Tim's group -- Sasha | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 18:08, 3 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Photon reconstruction (Azizah)
Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals [1]
- Wrapped CRYTUR crystals: 727
- Available for wrapping: 762 - 727 = 25 (10 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1313 (10 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 737 CRYTUR, available: 25
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Updates from the FCAL installation meetings with Tim's group -- Sasha