Difference between revisions of "JEF meeting, November 18, 2022"
From GlueXWiki
Line 26: | Line 26: | ||
*** Manpower and division of tasks | *** Manpower and division of tasks | ||
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
− | |||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak |
Revision as of 10:27, 18 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Updates -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals during this week [1]
- Wrapped CRYTUR crystals: 772
- Available for wrapping: 10 crystals were wrapped during last week
- Mindy (DSG group) continues wrapping crystals
- Mindy will start soldering wires to sockets (short meeting with Chris and Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1348 (13 modules fabricated since last week)
- Installation of the FCAL2 detector -- Sasha / Arshak
- Updates from the meetings with Tim's group November 2022
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Updates from the meetings with Tim's group November 2022
- Light Monitoring System -- Arshak