*** Olga [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/3_24_22/production_of_sc.jpg produced three sets of silicon cookies] during her visit to Jlab. She will take equipment to the GWU today. | *** Olga [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/3_24_22/production_of_sc.jpg produced three sets of silicon cookies] during her visit to Jlab. She will take equipment to the GWU today. | ||
*** Contract with the GWU is under preparation. | *** Contract with the GWU is under preparation. | ||
+ | ** DSG group: continue preshaping ESR reflectors (18 a day), and wrapping crystals (about 6 a day) | ||
+ | ** Chris A. is brazing brass straps, Bobby is honing PMT housing. | ||
+ | ** Igal is cutting Tedlar and ESR foils | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 209) | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 209) |
Revision as of 22:54, 24 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- PMT selection
- Olga checked PMT diameter of 360 newly received PMTs. Many PMTs from the last shipment (210 pcs) were tight (about 40%)
- These PMTs were exchanged with NPS. 40 more PMTs were selected with Vlad and are ready for exchange when purchase spares.
- Total number of PMTs: ordered and received: 1510, 140 installed on CCAL.
- Need to order about 100 (?) spare modules.
- These PMTs are also used in different test setups
- Production of Silicon cookies
- Received three fixtures to prepare silicon cookies (42 dishes in each fixture); Olga will take two fixtures to the GWU.
- Olga produced three sets of silicon cookies during her visit to Jlab. She will take equipment to the GWU today.
- Contract with the GWU is under preparation.
- DSG group: continue preshaping ESR reflectors (18 a day), and wrapping crystals (about 6 a day)
- Chris A. is brazing brass straps, Bobby is honing PMT housing.
- Igal is cutting Tedlar and ESR foils
- PMT selection
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations