Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
− | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | + | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped). |
** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21. | ** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21. | ||
− | ** Chris continued to braze brass strap assemblies | + | ** Chris continued to braze brass strap assemblies. |
** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings) | ** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings) | ||
** Igal is cutting Tedlar, Kapton, and ESR foils. | ** Igal is cutting Tedlar, Kapton, and ESR foils. |
Revision as of 00:43, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped).
- Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21.
- Chris continued to braze brass strap assemblies.
- Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
- Igal is cutting Tedlar, Kapton, and ESR foils.
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah