Difference between revisions of "JEF meeting, June 24, 2022"
From GlueXWiki
(→Agenda) |
|||
(26 intermediate revisions by 3 users not shown) | |||
Line 6: | Line 6: | ||
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5655 DNP2022 abstract] | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5655 DNP2022 abstract] | ||
* Simulations/Analysis | * Simulations/Analysis | ||
+ | ** [https://halldweb.jlab.org/wiki/images/d/d0/Glue-jefxd-igal-jaegle-24062022.pdf Update on eta to ggpi^0] -- ig | ||
+ | |||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
+ | *** Preshaping ESR foils (with the DSG) | ||
+ | *** Wrapping crystals (with the DSG) | ||
+ | *** Module fabrication | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 491 (60 + 185 + 166 + 80) | ||
+ | *** Remaining 126, 1.5 weeks of work | ||
**Students reports | **Students reports | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 598 </span> | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 37 CRYTUR], Remaining: 590 | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ||
+ | |||
+ | **Students reports | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill,Sasha,Igal,Zisis,Arshak,Tegan,Liping,Jane,Jon,Azizah,Olga,Phil,S.T. | ||
+ | *Igal gave an update on η→π0γγ | ||
+ | ** Currently using default algorithm for analysis while we work on improving the island algorithm | ||
+ | ** Included 2π0 background but most of the background after all cuts are applied is due to η→3π0 and η→2γ | ||
+ | *** Should also include other hadronic backgrounds Sasha included in original simulation for proposal | ||
+ | ** Extracted limit for B→π0γ using FCAL-2 | ||
+ | *** Used +/-2.5σ mass window | ||
+ | *** Found worse limit by about an order of magnitude compared to proposal, but should recheck using criteria Liping used | ||
+ | * For island algorithm would like to compare shower profile for insert to result of snake scan (real data from December 2019) | ||
+ | ** Need to take into account size of beam | ||
+ | * Module fabrication continues with great assistance from undergraduates | ||
+ | ** Students working wrapping crystals, ESR jigs, etc. -- Brandyn gave a short update on their activities | ||
+ | ** We are still short ~180 crystals | ||
+ | ** Grand total up to 598 fabricated modules, 37 of which are CRYTUR crystals | ||
+ | ** Still have quality control issues with brazing of straps | ||
+ | ** Waiting for mu-metal, but no obvious bottlenecks right now (have enough mu-metal for 1 month of work) | ||
+ | ** Have additional 3D printed jigs for gluing light guides | ||
+ | * Arshak gave an update on LMS development | ||
+ | ** Integrating sphere has arrived | ||
+ | ** Received 200 feat of fiber | ||
+ | ** To address issue of uniformity of light output over extent of plexiglas, tried reflective paint on edges and coating one side of plexiglas with gortex reflective material on small prototype | ||
+ | *** Looks more uniform but needs to be repeated with full scale prototype |
Latest revision as of 08:06, 1 July 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- DNP2022 abstract
- Simulations/Analysis
- Update on eta to ggpi^0 -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Module fabrication
- Wrapped CRYTUR crystals: 491 (60 + 185 + 166 + 80)
- Remaining 126, 1.5 weeks of work
- Students reports
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 598
- All 561 SICCAS
- 37 CRYTUR, Remaining: 590
- Clean room EEL126
- Students reports
- Light Monitoring System -- Arshak
Minutes
Attendees: Bill,Sasha,Igal,Zisis,Arshak,Tegan,Liping,Jane,Jon,Azizah,Olga,Phil,S.T.
- Igal gave an update on η→π0γγ
- Currently using default algorithm for analysis while we work on improving the island algorithm
- Included 2π0 background but most of the background after all cuts are applied is due to η→3π0 and η→2γ
- Should also include other hadronic backgrounds Sasha included in original simulation for proposal
- Extracted limit for B→π0γ using FCAL-2
- Used +/-2.5σ mass window
- Found worse limit by about an order of magnitude compared to proposal, but should recheck using criteria Liping used
- For island algorithm would like to compare shower profile for insert to result of snake scan (real data from December 2019)
- Need to take into account size of beam
- Module fabrication continues with great assistance from undergraduates
- Students working wrapping crystals, ESR jigs, etc. -- Brandyn gave a short update on their activities
- We are still short ~180 crystals
- Grand total up to 598 fabricated modules, 37 of which are CRYTUR crystals
- Still have quality control issues with brazing of straps
- Waiting for mu-metal, but no obvious bottlenecks right now (have enough mu-metal for 1 month of work)
- Have additional 3D printed jigs for gluing light guides
- Arshak gave an update on LMS development
- Integrating sphere has arrived
- Received 200 feat of fiber
- To address issue of uniformity of light output over extent of plexiglas, tried reflective paint on edges and coating one side of plexiglas with gortex reflective material on small prototype
- Looks more uniform but needs to be repeated with full scale prototype