*** Wrapping crystals | *** Wrapping crystals | ||
*** Module fabrication | *** Module fabrication | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 491 ( | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 491 |
+ | (60 + 185 + 166 + 8) | ||
+ | *** Remaining 126, 1.5 weeks of work)] | ||
**Students reports | **Students reports | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 21:44, 23 June 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- DNP2022 abstract
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Moving crystals from JLab's pool to the Lab [1][2] Moved 335 CRYTUR crystals (need 550).
- Preparation of parts[3][4][5]
- Preshaping ESR foils
- Wrapping crystals
- Module fabrication
- [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 491
(60 + 185 + 166 + 8)
- Remaining 126, 1.5 weeks of work)]
- Students reports
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 598 (All 561 SICCAS, 37 CRYTUR)
- Clean room EEL126
- Students reports
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak