Difference between revisions of "JEF meeting, June 17, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 11: | Line 11: | ||
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550). | **Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550). | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
+ | *** Preshaping ESR foils | ||
+ | *** Wrapping crystals | ||
+ | *** Module fabrication | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals] | ||
**Students reports | **Students reports |
Revision as of 09:18, 17 June 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Summer Students (2022)
- Moving crystals from JLab's pool to the Lab [1][2] Moved 335 CRYTUR crystals (need 550).
- Preparation of parts[3][4][5]
- Preshaping ESR foils
- Wrapping crystals
- Module fabrication
- Wrapped CRYTUR crystals
- Students reports
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules (list on Google Drive) Grand total 519
Clean room EEL126Clean room EEL126
- Light Monitoring System -- Arshak