Difference between revisions of "JEF meeting, June 17, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(10 intermediate revisions by 2 users not shown)
Line 10: Line 10:
 
**[https://halldweb.jlab.org/detectors/fcal2/budget/students2.xlsx Summer Students (2022) ]
 
**[https://halldweb.jlab.org/detectors/fcal2/budget/students2.xlsx Summer Students (2022) ]
 
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550).
 
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550).
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/wrapping.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/cutting.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/cutting1.jpg]
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
 +
*** Preshaping ESR foils
 +
*** Wrapping crystals
 +
*** Module fabrication
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals]
**Students reports
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/JLab_June_24th_Presentation.pdf Students reports]
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Fabricated modules] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)]  <span style="color:#FF0000"> Grand total 467  </span>
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Fabricated modules] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)]  <span style="color:#FF0000"> Grand total 519 </span>
 +
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
Attendees:  Bill,Sasha,Zisis,Phil,Igal,Tegan,Olga,Axel,Arshak,Azizah,Liping,Jon,Jaden,Dax,Christopher,S.T.
 +
* Eugene to order 100 more crystals this fiscal year, 100 more next fiscal year
 +
* Ordered more ESR and mu-metal
 +
* Brazing is lagging behind other preparation steps
 +
* Dax and Jaden presented slides showing all their efforts toward module construction
 +
* Grand total number of fabricated modules up to 519 as of the Friday meeting
 +
* Arshak working on addressing light intensity profile as a function of in plexiglas for LMS
 +
* Tegan gave an update on reconstruction of single photon and di-photon clusters in FCAL-1 and FCAL-2 using default and island algorithms
 +
** log-weighting cluster positions biases toward small apparent cluster separation compared to thrown separation
 +
** FCAL-2 reconstructed energy biased toward higher energy

Latest revision as of 22:08, 23 June 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Bill,Sasha,Zisis,Phil,Igal,Tegan,Olga,Axel,Arshak,Azizah,Liping,Jon,Jaden,Dax,Christopher,S.T.

  • Eugene to order 100 more crystals this fiscal year, 100 more next fiscal year
  • Ordered more ESR and mu-metal
  • Brazing is lagging behind other preparation steps
  • Dax and Jaden presented slides showing all their efforts toward module construction
  • Grand total number of fabricated modules up to 519 as of the Friday meeting
  • Arshak working on addressing light intensity profile as a function of in plexiglas for LMS
  • Tegan gave an update on reconstruction of single photon and di-photon clusters in FCAL-1 and FCAL-2 using default and island algorithms
    • log-weighting cluster positions biases toward small apparent cluster separation compared to thrown separation
    • FCAL-2 reconstructed energy biased toward higher energy