(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 22: | Line 22: | ||
=Agenda= | =Agenda= | ||
* SICCAS crystals | * SICCAS crystals | ||
+ | ** Sasha: "Some updates from SICCAS: the second batch of crystals will likely be produced by the end of this month." | ||
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication] | * [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication] | ||
+ | ** Tim W.: "The 500 each brass parts, the 20 light guides and the 20 mu metal shields are in the cleanroom." | ||
* COMCAL tests, TAC running, etc. | * COMCAL tests, TAC running, etc. | ||
* Preparations for PAC meeting (jeopardy) | * Preparations for PAC meeting (jeopardy) | ||
* Simulations | * Simulations | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Zisis, Liping, Arshak, Susan, Phil, Jon, Igal, S.T. | ||
+ | * The Lab is slowly starting to reopen in preparation for continuing running starting July 27. Access to the campus is still very limited. | ||
+ | ** [https://www.jlab.org/sites/default/files/TJNAF%20Resumption%20of%20On-Site%20Operations%20Plan%20Rev%201%5B2%5D.pdf Resumption plan] | ||
+ | *Tim B. asked about the status of a Gaussian pulser to use at UNCW. S.T. contacted Sasha, who will follow up. | ||
+ | * We discussed a new B-boson reach plot produced by Sean Tulin and Liping. The plan is to include this in a brief write-up to be posted to the JEF wiki | ||
+ | ** Need to add detached vertexes to B-boson simulations? |
Latest revision as of 07:38, 15 June 2020
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Sasha: "Some updates from SICCAS: the second batch of crystals will likely be produced by the end of this month."
- Preparation for module fabrication
- Tim W.: "The 500 each brass parts, the 20 light guides and the 20 mu metal shields are in the cleanroom."
- COMCAL tests, TAC running, etc.
- Preparations for PAC meeting (jeopardy)
- Simulations
Minutes
Attendees: Zisis, Liping, Arshak, Susan, Phil, Jon, Igal, S.T.
- The Lab is slowly starting to reopen in preparation for continuing running starting July 27. Access to the campus is still very limited.
- Tim B. asked about the status of a Gaussian pulser to use at UNCW. S.T. contacted Sasha, who will follow up.
- We discussed a new B-boson reach plot produced by Sean Tulin and Liping. The plan is to include this in a brief write-up to be posted to the JEF wiki
- Need to add detached vertexes to B-boson simulations?