Difference between revisions of "JEF meeting, July 1, 2022"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
=Agenda=
 
=Agenda=
 
* Simulations/Analysis
 
* Simulations/Analysis
 +
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
Line 6: Line 7:
 
*** Wrapping crystals (with the DSG)
 
*** Wrapping crystals (with the DSG)
 
*** Module fabrication
 
*** Module fabrication
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 491 (60 + 185 + 166 + 80)
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 559 (60 + 185 + 166 + 80 + 68)
*** Remaining 126, 1.5 weeks of work
+
*** <span style="color:#FF0000"> All currently available </span>
 
**Students reports
 
**Students reports
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha

Revision as of 08:57, 1 July 2022

Agenda

  • Simulations/Analysis
    • Students reports
  • Light Monitoring System -- Arshak