Difference between revisions of "JEF meeting, January 3, 2020"
From GlueXWiki
Line 23: | Line 23: | ||
* Status of the crystal production (SICCAS) | * Status of the crystal production (SICCAS) | ||
* Preparation for the crystal QA check | * Preparation for the crystal QA check | ||
− | * Module fabrication plan | + | * Studies of light guides |
+ | * Module fabrication plan (task list) |
Latest revision as of 19:26, 2 January 2020
eeting time and location= 10:00 am EST (JLab time) F226
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- Status of the crystal production (SICCAS)
- Preparation for the crystal QA check
- Studies of light guides
- Module fabrication plan (task list)