*** Cleaning brass assemblies | *** Cleaning brass assemblies | ||
*** Gluing light guides | *** Gluing light guides | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 684 |
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | *** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha |
Revision as of 23:22, 11 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Received 25 crystals from CRYTUR (last from our 2nd order).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 684
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1121
- All SICCAS 577 SICCAS
- 544 CRYTUR, Remaining: 133
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- Light Monitoring System -- Arshak