Difference between revisions of "JEF meeting, August 12, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 7: | Line 7: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
** [https://halldweb.jlab.org/wiki/images/b/bd/Glue-jefxd-igal-jaegle-12082022.pdf Updates] -- ig | ** [https://halldweb.jlab.org/wiki/images/b/bd/Glue-jefxd-igal-jaegle-12082022.pdf Updates] -- ig | ||
− | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Received | + | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Received all crystals from the second CRYTUR order and 5 crystals from the new order by physics division (expect to receive 150 crystals)]. |
** Meeting with the DSG group [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/fcal_status_8_2_22.pdf]. Mindy and George will continue working on the project. | ** Meeting with the DSG group [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/fcal_status_8_2_22.pdf]. Mindy and George will continue working on the project. | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] |
Revision as of 08:32, 12 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Updates -- ig
- Received all crystals from the second CRYTUR order and 5 crystals from the new order by physics division (expect to receive 150 crystals).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 684
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1153
- All SICCAS 577 SICCAS
- 576 CRYTUR, Remaining: 121
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- Light Monitoring System -- Arshak