Difference between revisions of "JEF meeting, August 12, 2022"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142]...") |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Received 25 crystals from CRYTUR] (last from our 2nd order). | ||
+ | ** Meeting with the DSG group [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/fcal_status_8_2_22.pdf]. Mindy and George will continue working on the project. | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
+ | *** Preshaping ESR foils (with the DSG) | ||
+ | *** Wrapping crystals (with the DSG) | ||
+ | *** Preparing Silicon cookies | ||
+ | *** Module fabrication | ||
+ | *** Cleaning brass assemblies | ||
+ | *** Gluing light guides | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 664 | ||
+ | *** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 23:12, 11 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Received 25 crystals from CRYTUR (last from our 2nd order).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 664
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak