Difference between revisions of "Hodoscope Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Meeting Agenda)
(Meeting Agenda)
Line 44: Line 44:
 
** Final inspection, storage, and shipping counters to JLab
 
** Final inspection, storage, and shipping counters to JLab
 
*;<ins> Work performed at JLab </ins>
 
*;<ins> Work performed at JLab </ins>
** Checing PMTs and electronics  
+
** Checking PMTs and electronics  
 
** Overview of the counter's mounting frame and procedures
 
** Overview of the counter's mounting frame and procedures
 +
** Fixture to mount light guides on the support collar.
 +
** Mounting PMTs on the frame (alignment check)
 +
** Gluing PMTs to light guides. Joint inspection.
 +
** Final counter fabrication
 
** Final Construction Plan and Facilities
 
** Final Construction Plan and Facilities
 
** Testing procedures
 
** Testing procedures

Revision as of 12:23, 7 June 2013

Date and Time

June 11, 2013

Video Connection information if needed

JLab Conference Room L102

  • ESNET and EVO session
  • Phone only if requested:
    • +1-866-740-1260 : US
    • access code: 3421244# (remember the "#"). Phone line by request only.

Participants

CUA

  • Franz Klein (Professor of Physics)

JLab

  • Fernando Barbosa (Hall D eletrical engineer)
  • Eugene Chudakov (Hall D group leader)
  • William Crahen (Hall D engineer)
  • Bruce Lenzer (JLab ESH&Q)
  • Mark Ito (Hall D Staff)
  • Elton Smith (Hall D Staff)
  • Alexander Somov (Hall D Staff, SOTR)
  • Timothy Whitlatch (Hall D engineer)
  • Jarrod Fitzpatrick (CFO)

Topics/Issues that need discussion/resolution

Documents on the Hodoscope Construction

Meeting Agenda

  • 13:00 Overview of the Construction Facilities at CUA.
  • 13:30 Project Overview
    • Scope of contract and current review
    • Status of construction
  • 14:00 Review of the construction procedures and corresponding Technical Documents
    Work performed at CUA
    • Inspection (measurement) of scintillators and light guides. Parameters recording.
    • Wrapping materials
    • Wrapping procedures
    • Final inspection, storage, and shipping counters to JLab
    Work performed at JLab
    • Checking PMTs and electronics
    • Overview of the counter's mounting frame and procedures
    • Fixture to mount light guides on the support collar.
    • Mounting PMTs on the frame (alignment check)
    • Gluing PMTs to light guides. Joint inspection.
    • Final counter fabrication
    • Final Construction Plan and Facilities
    • Testing procedures
    • Quality Assurance Plans and Acceptance Test Plans
    • Documentation and Travelers
    • Personnel training
    • Schedule and Tracking
  • 15:00 Meeting with JLab Financial people.
    • Billing and Reporting
  • 15:30 Closeout
  • 15:40 Adjourn

Contract Related Documents

(use gluex account to access files)

Construction Plan

Quality Assurance and Acceptance Test Plan