* We received the [[media:LiebertUPS.pdf | Liebert UPS]] sometime in the beginning of February and decided to store in in the Experimental Storage Building. We needed to prepare mechanical installation plan (Tim), electrical plan (Giles) and material handling (Tom) before moving it in since it is a pretty big item.  
 
* We received the [[media:LiebertUPS.pdf | Liebert UPS]] sometime in the beginning of February and decided to store in in the Experimental Storage Building. We needed to prepare mechanical installation plan (Tim), electrical plan (Giles) and material handling (Tom) before moving it in since it is a pretty big item.  
 
   
 
   
== Rack Room Power and Cooling Specs ==  
+
== Rack Room Power and Cooling Specs ==
 +
 
 +
* In the Hall D counting house we have two power panels: 202-CH-EP1 and 202-CH-EP2.
 +
* Power panel 202-CH-EP1 feeds panel 202-CH-EP2 from 202-CH-EP1-35.
 +
* Total power in 202-CH-EP1 is 400 Amps for 3 phases (120V on each phase). This panel also feeds the racks in the telecommunication room.
 +
* The UPS will get its power from 202-CH-EM1-31, which is 3-phase 480V panel,  175 A on 3 phases (~123 kVA). The panel is in a different room, so the facilities management will need to drill a hole in the wall to bring the power into the rack room.
  
 
== UPS Installation ==  
 
== UPS Installation ==  

Revision as of 18:43, 2 March 2012

Hall D Counting House

  • We received Hall D Counting House beneficial occupancy at the end of January of 2012. At this point some issues were still unresolved (incomplete punch-list).
  • Computer Center (Bryan and Brent) installed their network switch in the telecommunication rack room. They installed the wireless in the counting house, as well as in the hall and to the trailer.
  • We received the Liebert UPS sometime in the beginning of February and decided to store in in the Experimental Storage Building. We needed to prepare mechanical installation plan (Tim), electrical plan (Giles) and material handling (Tom) before moving it in since it is a pretty big item.

Rack Room Power and Cooling Specs

  • In the Hall D counting house we have two power panels: 202-CH-EP1 and 202-CH-EP2.
  • Power panel 202-CH-EP1 feeds panel 202-CH-EP2 from 202-CH-EP1-35.
  • Total power in 202-CH-EP1 is 400 Amps for 3 phases (120V on each phase). This panel also feeds the racks in the telecommunication room.
  • The UPS will get its power from 202-CH-EM1-31, which is 3-phase 480V panel, 175 A on 3 phases (~123 kVA). The panel is in a different room, so the facilities management will need to drill a hole in the wall to bring the power into the rack room.

UPS Installation

Power distribution to the racks and control room