Difference between revisions of "Hall D Counting House Installations"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Hall D Counting House = * We received Hall D Counting House beneficial occupancy at the end of January of 2012. At this point some issues were still unresolved (incomplete p...")
 
(Hall D Counting House)
Line 6: Line 6:
 
* Computer Center (Bryan and Brent) installed their network switch in the telecommunication rack room. They installed the wireless in the counting house, as well as in the hall and to the trailer.  
 
* Computer Center (Bryan and Brent) installed their network switch in the telecommunication rack room. They installed the wireless in the counting house, as well as in the hall and to the trailer.  
  
* We received the Liebert UPS sometime in the beginning of February and decided to store in in the Experimental Storage Building.
+
* We received the [[media:LiebertUPS.pdf | Liebert UPS]] sometime in the beginning of February and decided to store in in the Experimental Storage Building. We needed to prepare mechanical installation plan (Tim), electrical plan (Giles) and material handling (Tom) before moving it in since it is a pretty big item.
 +
 +
== Rack Room Power and Cooling Specs ==
 +
 
 +
== UPS Installation ==
 +
 
 +
 
 +
== Power distribution to the racks and control room ==

Revision as of 18:33, 2 March 2012

Hall D Counting House

  • We received Hall D Counting House beneficial occupancy at the end of January of 2012. At this point some issues were still unresolved (incomplete punch-list).
  • Computer Center (Bryan and Brent) installed their network switch in the telecommunication rack room. They installed the wireless in the counting house, as well as in the hall and to the trailer.
  • We received the Liebert UPS sometime in the beginning of February and decided to store in in the Experimental Storage Building. We needed to prepare mechanical installation plan (Tim), electrical plan (Giles) and material handling (Tom) before moving it in since it is a pretty big item.

Rack Room Power and Cooling Specs

UPS Installation

Power distribution to the racks and control room