Difference between revisions of "GlueX Target Meeting, January 18, 2011"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes: complete draft)
Line 37: Line 37:
 
==UMass MOU==
 
==UMass MOU==
  
Mark reviewed [[???|notes from a meeting]] last week on the construction MOU with UMass
+
Mark reviewed [[Private:Issues with the UMass MOU|notes from a meeting]] last week on the construction MOU with UMass. Allison Lung suggested some significant changes. We are thinking about how to proceed. We will have to schedule a discussion (perhaps at the next collaboration meeting).
  
* pulse tube refrigerator purchase, now or later?
+
==Target Refrigerator==
* uses 11 kW, water cooled
+
 
* Chris got flow diagram of Hall B cryotarget, looks complicated
+
* Chris asked for some guidance about how soon we will want to purchase the refrigerator.
 +
* He mentioned in passing that the unit being considered is water cooled and uses up to 11 kW.
 +
* He got a copy of the flow diagram for the Hall B cryotarget. It looks a bit on the complicated side.
 +
 
 +
==Next Meeting==
 +
 
 +
We will meet again in four weeks on Tuesday, February 15.

Revision as of 16:37, 18 January 2011

Location, Time

Tuesday, January 18, 2011
1:30 pm EST
JLab: CEBAF Center, Room F326

Agenda

  1. Review minutes from previous meeting: all
  2. MOU Status: Mark

Communication

Videoconferencing

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .

Minutes

Attendees:

  • JLab: Mark Ito (chair), Chris Keith, Yi Qiang, Elliott Wolin
  • UMass: Rory Miskimen

UMass MOU

Mark reviewed notes from a meeting last week on the construction MOU with UMass. Allison Lung suggested some significant changes. We are thinking about how to proceed. We will have to schedule a discussion (perhaps at the next collaboration meeting).

Target Refrigerator

  • Chris asked for some guidance about how soon we will want to purchase the refrigerator.
  • He mentioned in passing that the unit being considered is water cooled and uses up to 11 kW.
  • He got a copy of the flow diagram for the Hall B cryotarget. It looks a bit on the complicated side.

Next Meeting

We will meet again in four weeks on Tuesday, February 15.