GlueX Target Meeting, December 21, 2010
Contents
Location, Time
Tuesday, December 21, 2010
1:30 pm EST
JLab: CEBAF Center, Room F326
Agenda
- Review minutes from previous meeting: all
- Refrigerator plans: Chris, Tim
- Schedule review: all
- MOU Status: Mark
Communication
Conference Group, US: 800-377-8846, Canada: 888-276-7715, International: 302-709-8424
participant code: 77438230
ESNet: 8542553
EVO: direct meeting link, phone bridge ID: 269 1668
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-12
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-12/ .
Minutes
Target Meeting, 12/21
20-30W at 24 K hydrogen use 5 W in Hall B hallB heater 2-3 W typical 19 K, 3 psi over atmosphere, supercooled for no bubbles 1.5 W at 4 K for helium
helium 3 require more power
starting this spring Chris will put some effort
• gas system • refrigerator system • heat transfer
Chris: contact physicist to be able to operate target without adult supervision
Hovanes: controls
right now swamped with polarized target for hall a
putting things into change request, including cost estimate
starting with flow for saclay target; probably can be simpler
in halls a and c minimize automated valves
rely on mechanical controls
re-work schedule and costs, part of ETC