Difference between revisions of "GlueX Target Meeting, December 21, 2010"
(→Agenda: add schedule review and link) |
|||
Line 19: | Line 19: | ||
[http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MDMaM82a2lDlDu9a98D99D direct meeting link], phone bridge ID: 269 1668<br> | [http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MDMaM82a2lDlDu9a98D99D direct meeting link], phone bridge ID: 269 1668<br> | ||
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-12</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-12/ . | '''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-12</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-12/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Target Meeting, 12/21 | ||
+ | |||
+ | 20-30W at 24 K hydrogen | ||
+ | use 5 W in Hall B | ||
+ | hallB heater 2-3 W | ||
+ | typical 19 K, 3 psi over atmosphere, supercooled for no bubbles | ||
+ | 1.5 W at 4 K for helium | ||
+ | |||
+ | helium 3 require more power | ||
+ | |||
+ | starting this spring Chris will put some effort | ||
+ | |||
+ | • gas system | ||
+ | • refrigerator system | ||
+ | • heat transfer | ||
+ | |||
+ | Chris: contact physicist to be able to operate target without adult supervision | ||
+ | |||
+ | Hovanes: controls | ||
+ | |||
+ | right now swamped with polarized target for hall a | ||
+ | |||
+ | putting things into change request, including cost estimate | ||
+ | |||
+ | starting with flow for saclay target; probably can be simpler | ||
+ | |||
+ | in halls a and c minimize automated valves | ||
+ | |||
+ | rely on mechanical controls | ||
+ | |||
+ | re-work schedule and costs, part of ETC |
Revision as of 15:24, 21 December 2010
Contents
Location, Time
Tuesday, December 21, 2010
1:30 pm EST
JLab: CEBAF Center, Room F326
Agenda
- Review minutes from previous meeting: all
- Refrigerator plans: Chris, Tim
- Schedule review: all
- MOU Status: Mark
Communication
Conference Group, US: 800-377-8846, Canada: 888-276-7715, International: 302-709-8424
participant code: 77438230
ESNet: 8542553
EVO: direct meeting link, phone bridge ID: 269 1668
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-12
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-12/ .
Minutes
Target Meeting, 12/21
20-30W at 24 K hydrogen use 5 W in Hall B hallB heater 2-3 W typical 19 K, 3 psi over atmosphere, supercooled for no bubbles 1.5 W at 4 K for helium
helium 3 require more power
starting this spring Chris will put some effort
• gas system • refrigerator system • heat transfer
Chris: contact physicist to be able to operate target without adult supervision
Hovanes: controls
right now swamped with polarized target for hall a
putting things into change request, including cost estimate
starting with flow for saclay target; probably can be simpler
in halls a and c minimize automated valves
rely on mechanical controls
re-work schedule and costs, part of ETC