Difference between revisions of "GlueX Target Meeting, April 12, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=Location, Time=
 
=Location, Time=
  
Tuesday, March 10, 2011<br>
+
Tuesday, April 12, 2011<br>
 
1:00 pm EST<br>
 
1:00 pm EST<br>
 
JLab: CEBAF Center, Room F326/327<br>
 
JLab: CEBAF Center, Room F326/327<br>
Line 29: Line 29:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-2Q/ .
  
 
=Minutes=
 
=Minutes=
  
target meeting minutes
+
Present: Hovanes Egiyan, Mark Ito, Chris Keith, Rory Miskimen, Tim Whitlatch (chair), Elliott Wolin
  
notes as minutes
+
* Tim brought along drawings and notes made two years ago, modeled on the Hall B cryotarget.
• present
+
** We may need to pick Steve Christo's brain, especially about lessons learned in Hall B.
• Touch up the notes
+
** The Hall B targets are Kapton, with DP190 epoxy joining the seams. The scattering chambers are made of Rohacell.
 +
** We will have to perform pressure tests on the cells. Current code may be more stringent than standards at the time the Hall B targets were commissioned.
 +
* The refrigerator will be bought in October or November.
 +
** The model being considered can liquify hydrogen starting from room temperature, at about a liter per hour, corresponding to 15 watts at 20 K. Liquid hydrogen volume looks to be of order a liter. Helium-4 will take longer to liquify.
 +
** The requirement that we want to be able to empty/fill the target on the time-scale of a few hours (preferably less) was restated.
 +
** The refrigerator have no cold moving parts.
 +
* We will have to design and build the heat exchanger and heating element. The refrigerator will stay on continuously and temperature of the hydrogen controlled with a heater in the cold head.
 +
* The gas panel can probably copied from that used by Q-Weak.
 +
* Mechanical considerations
 +
** The target, its plumbing, and the refrigerator (including cold head) will all be a "rigid body". Adjustment of the position of the target on the beam line will be accomplished by positioning the entire structure.
  
Notes
+
=Items for the Next Meeting=
 
+
Present: Hovanes Egiyan, Mark Ito, Chris Keith, Rory Miskimen, Tim Whitlatch (chair), Elliott Wolin
+
  
construction plans were made two years ago
+
* Chris will create a P&I diagram for the gas/refrigerator system
may need to pick steve's brain, lessons learned
+
* Chris will distribute the manual for the refrigerator so others can get started thinking about the relevant controls and monitoring.
kapton for most of hall b, dp190 epoxy
+
* We will invite Steve to the next meeting.
scattering chamber rohacell
+
* Next meeting in about a month.
tests on kapton
+
no grandfather clause
+
must be built according to code
+
must be tested since design will not fulfill code on its face
+
• cell
+
• vacuum chamber
+
• refrigerator
+
• cryo system
+
refrigerator will be bought oct or nov
+
liq hydrogen, 1 liter per hour
+
15 watts at 20 K
+
we must design and build heat exchanger
+
no cold moving parts
+
helium 4 will take longer to liquify
+
probably copy the q-weak gas panel
+
P&I diagram for gas/hydrogen system
+
want to be able to empty/fill the target on hour-type time-scale
+
temperature control heater probably on the compressor
+
mechanical
+
target attached to a flange upstream, and that attached to cold head, etc.
+
get manual from Chris
+
get Steve for next meeting
+

Latest revision as of 22:43, 31 March 2015

Location, Time

Tuesday, April 12, 2011
1:00 pm EST
JLab: CEBAF Center, Room F326/327

Agenda

  1. Review minutes from previous meeting: all
  2. Target Mechanical Design: Tim, Chris
  3. MOU status: Mark

Communication

Video Conferencing

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-2Q/ .

Minutes

Present: Hovanes Egiyan, Mark Ito, Chris Keith, Rory Miskimen, Tim Whitlatch (chair), Elliott Wolin

  • Tim brought along drawings and notes made two years ago, modeled on the Hall B cryotarget.
    • We may need to pick Steve Christo's brain, especially about lessons learned in Hall B.
    • The Hall B targets are Kapton, with DP190 epoxy joining the seams. The scattering chambers are made of Rohacell.
    • We will have to perform pressure tests on the cells. Current code may be more stringent than standards at the time the Hall B targets were commissioned.
  • The refrigerator will be bought in October or November.
    • The model being considered can liquify hydrogen starting from room temperature, at about a liter per hour, corresponding to 15 watts at 20 K. Liquid hydrogen volume looks to be of order a liter. Helium-4 will take longer to liquify.
    • The requirement that we want to be able to empty/fill the target on the time-scale of a few hours (preferably less) was restated.
    • The refrigerator have no cold moving parts.
  • We will have to design and build the heat exchanger and heating element. The refrigerator will stay on continuously and temperature of the hydrogen controlled with a heater in the cold head.
  • The gas panel can probably copied from that used by Q-Weak.
  • Mechanical considerations
    • The target, its plumbing, and the refrigerator (including cold head) will all be a "rigid body". Adjustment of the position of the target on the beam line will be accomplished by positioning the entire structure.

Items for the Next Meeting

  • Chris will create a P&I diagram for the gas/refrigerator system
  • Chris will distribute the manual for the refrigerator so others can get started thinking about the relevant controls and monitoring.
  • We will invite Steve to the next meeting.