Difference between revisions of "GlueX Target Design Review, January 24, 2012"

From GlueXWiki
Jump to: navigation, search
(Notes: Steve wants to weld)
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
Line 3: Line 3:
 
==Review Slides==
 
==Review Slides==
  
[https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20January%2024,%202012.pptx Jim's Presentation]
+
[https://halldweb.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20January%2024,%202012.pptx Jim's Presentation]
  
 
==Notes==
 
==Notes==

Latest revision as of 15:16, 31 March 2015

Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Tim Whitlatch, Elliott Wolin

Review Slides

Jim's Presentation

Notes

As recorded by Mark:

  • Steve suggests welded hydrogen line connections rather than fittings, fittings developed leaks over time.
  • Concern from Dave: distance of the condenser from the cold head. Jim moved it downstream to reduce volume of hydrogen in feed line.
  • Dave suggests larger surface contact for making the thermal short between hydrogen line and shield.
  • Hall B used boil-off helium to pre-cool target gas. We may add pre-cooler from higher temp head.
  • Dave suggested connecting the heater directly to the condenser, not the conduction tube.
  • Dave recommends high quality temperature and pressure instrumentation, well calibrated. Useful in knowing when the target is full by knowing position in the phase diagram.
  • Dave made had some comments on how to optimize the arrangement of the feed and return lines.