Difference between revisions of "GlueX Target Design Review, February 23, 2012"

From GlueXWiki
Jump to: navigation, search
(Notes)
m (Notes)
Line 7: Line 7:
 
==Notes==
 
==Notes==
  
* target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP
+
* Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
 
* Hall B pumps on scattering chamber with turbo pump all the time.
 
* Hall B pumps on scattering chamber with turbo pump all the time.
 
* Jim added [http://www.lakeshore.com/products/Cryogenic-Temperature-Sensors/Cernox/Models/Pages/Overview.aspx Lakeshore Cernox temperature sensors] at various heights.
 
* Jim added [http://www.lakeshore.com/products/Cryogenic-Temperature-Sensors/Cernox/Models/Pages/Overview.aspx Lakeshore Cernox temperature sensors] at various heights.
** Chris requested that they be removable, to replace defective ones
+
** Chris requested that they be removable, to replace defective ones.
 
* Chris recommends the [http://www.lakeshore.com/products/cryogenic-temperature-monitors/model-218/Pages/Overview.aspx Lakeshore Model 218] 8-channel temperature monitor read-out unit.
 
* Chris recommends the [http://www.lakeshore.com/products/cryogenic-temperature-monitors/model-218/Pages/Overview.aspx Lakeshore Model 218] 8-channel temperature monitor read-out unit.
 
* System should be able to liquefy helium-4, taking it down to 3 K.
 
* System should be able to liquefy helium-4, taking it down to 3 K.

Revision as of 15:41, 23 February 2012

Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Chris Keith, Elton Smith, Tim Whitlatch, Elliott Wolin

Review Slides

Jim's Presentation

Notes

  • Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
  • Hall B pumps on scattering chamber with turbo pump all the time.
  • Jim added Lakeshore Cernox temperature sensors at various heights.
    • Chris requested that they be removable, to replace defective ones.
  • Chris recommends the Lakeshore Model 218 8-channel temperature monitor read-out unit.
  • System should be able to liquefy helium-4, taking it down to 3 K.
  • Jim will look into adding a relief tube to by-pass normal feed in case of boil off of target liquid.

Notes recorded by Mark.