Difference between revisions of "GlueX Target Design Review, February 23, 2012"

From GlueXWiki
Jump to: navigation, search
(Notes)
Line 1: Line 1:
Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Tim Whitlatch, Elliott Wolin
+
Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Chris Keith, Elton Smith, Tim Whitlatch, Elliott Wolin
  
 
==Review Slides==
 
==Review Slides==
Line 8: Line 8:
  
 
As recorded by Mark:
 
As recorded by Mark:
 
*
 
target meeting, 2/23/12
 
 
jim, elliott, dave k, mark, elton, steve c, tim, chris k
 
  
 
.4 l target
 
.4 l target

Revision as of 15:21, 23 February 2012

Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Chris Keith, Elton Smith, Tim Whitlatch, Elliott Wolin

Review Slides

Jim's Presentation

Notes

As recorded by Mark:

.4 l target 1000 l at STP

hall b pumps on scattering chamber with turbo pump all the time

flag on height of fins in condenser, flag raised on gas flow in case of target boiling

lakeshore cernox temperature sensors at various heights, Chris Keith requested steve reports problems with vcr fittings

lakeshore model 218 8-channel read-out montor temperatures

should be able to do helium 4 go down to 3 degrees not 2.3 k


relief tube, not used for cool down and gas feed, by-passes