+ | target meeting, 2/23/12 | ||
+ | |||
+ | jim, elliott, dave k, mark, elton, steve c, tim, chris k | ||
+ | |||
+ | .4 l target | ||
+ | 1000 l at STP | ||
+ | |||
+ | hall b pumps on scattering chamber with turbo pump all the time | ||
+ | |||
+ | flag on height of fins in condenser, flag raised on gas flow in case of target boiling | ||
+ | |||
+ | lakeshore cernox temperature sensors at various heights, Chris Keith requested | ||
+ | steve reports problems with vcr fittings | ||
+ | |||
+ | lakeshore model 218 8-channel read-out montor temperatures | ||
+ | |||
+ | should be able to do helium 4 | ||
+ | go down to 3 degrees | ||
+ | not 2.3 k | ||
+ | |||
+ | |||
+ | relief tube, not used for cool down and gas feed, by-passes |
Revision as of 15:18, 23 February 2012
Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Tim Whitlatch, Elliott Wolin
Review Slides
Notes
As recorded by Mark:
target meeting, 2/23/12
jim, elliott, dave k, mark, elton, steve c, tim, chris k
.4 l target 1000 l at STP
hall b pumps on scattering chamber with turbo pump all the time
flag on height of fins in condenser, flag raised on gas flow in case of target boiling
lakeshore cernox temperature sensors at various heights, Chris Keith requested steve reports problems with vcr fittings
lakeshore model 218 8-channel read-out montor temperatures
should be able to do helium 4 go down to 3 degrees not 2.3 k
relief tube, not used for cool down and gas feed, by-passes