GlueX TOF Meeting, September 27, 2012

From GlueXWiki
Revision as of 15:02, 28 September 2012 by Marki (Talk | contribs)

Jump to: navigation, search

GlueX TOF Meeting
Thursday, September 27, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
  4. Contract status -> EVMS status
  5. Calibration and Alignment
  6. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Chuck Hutton, Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann

Mini-TOF Construction

mini-tof material coming in big steel channel, getting it from down the road from jlab have to buy 20 ft length piece mini0tof: issue of costs

TOF Procurements

gluing jig, materials arriving

procurements, moving forward specifications to eljen and stgobain, heard back from eljen AJ200 revamped machines, can get scintillator sooner than anticipated, within 6 weeks of order flook of orders to both firms for scintillator, japanese reactor crisis-related chuck halbert

uvt acrylics, addtional quotes requested, another company can provide same material, came in better 240 ft can be delivered in 6 weeks purchased 2 rods from new company 3m, esr daylighting film trying for long rolls, rather than small sheets

laser scattering

TOF Construction

construction jigs, increased spacing glue 9 scintillators at a time ian working on a wrapping jig u- channel, with wrapping material coming up and wrap material around rtv for mounting pmt's spin-off of ge sillicon, momentum produces rtv 615 and 655, 615 used at other experiments,

tests done with glue, done on a verticall surface, looks good 20 ft-lb torque, no budge