Difference between revisions of "GlueX TOF Meeting, September 27, 2012"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
Line 28: Line 28:
 
=Minutes=
 
=Minutes=
  
tof meeting notes, Sep. 27
+
Present:
 
+
* '''FSU''': Paul Eugenio, Sasha Ostrovidov
sasha, paul
+
* '''JLab''': Chuck Hutton, Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann
elton, beni, tim, chuck, mark
+
 
+
  
 +
==Mini-TOF Construction==
  
 
mini-tof
 
mini-tof
Line 39: Line 38:
 
big steel channel, getting it from down the road from jlab
 
big steel channel, getting it from down the road from jlab
 
have to buy 20 ft length piece
 
have to buy 20 ft length piece
mini0tof: issue
+
mini0tof: issue of costs
  
 +
==TOF Procurements==
 
gluing jig, materials arriving
 
gluing jig, materials arriving
  
Line 56: Line 56:
  
 
laser scattering
 
laser scattering
 +
 +
==TOF Construction==
  
 
construction jigs, increased spacing
 
construction jigs, increased spacing
Line 65: Line 67:
 
tests done with glue, done on a verticall surface, looks good
 
tests done with glue, done on a verticall surface, looks good
 
20 ft-lb torque, no budge
 
20 ft-lb torque, no budge
 
halld engineering release documents, copy it, change it ,change specificiation for the tof to drop dimentions
 

Revision as of 15:02, 28 September 2012

GlueX TOF Meeting
Thursday, September 27, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
  4. Contract status -> EVMS status
  5. Calibration and Alignment
  6. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Chuck Hutton, Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann

Mini-TOF Construction

mini-tof material coming in big steel channel, getting it from down the road from jlab have to buy 20 ft length piece mini0tof: issue of costs

TOF Procurements

gluing jig, materials arriving

procurements, moving forward specifications to eljen and stgobain, heard back from eljen AJ200 revamped machines, can get scintillator sooner than anticipated, within 6 weeks of order flook of orders to both firms for scintillator, japanese reactor crisis-related chuck halbert

uvt acrylics, addtional quotes requested, another company can provide same material, came in better 240 ft can be delivered in 6 weeks purchased 2 rods from new company 3m, esr daylighting film trying for long rolls, rather than small sheets

laser scattering

TOF Construction

construction jigs, increased spacing glue 9 scintillators at a time ian working on a wrapping jig u- channel, with wrapping material coming up and wrap material around rtv for mounting pmt's spin-off of ge sillicon, momentum produces rtv 615 and 655, 615 used at other experiments,

tests done with glue, done on a verticall surface, looks good 20 ft-lb torque, no budge