Difference between revisions of "GlueX TOF Meeting, October 27, 2011"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
(Minutes)
Line 31: Line 31:
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Tim Whitlatch, Beni Zihlmann
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Tim Whitlatch, Beni Zihlmann
  
 +
==Review of Minutes from the Last Meeting==
  
 +
We went over the [[GlueX TOF Meeting, October 13, 2011#Minutes|minutes of the October 13th meeting]].
  
chuck will send chuck a new model
+
* Chuck has been in contact with Ian Winger. Ian will send a new model of the half-width light guide.
standard light guide stays the same, half width needs to be redone,
+
  
 
beni,
 
beni,

Revision as of 13:13, 27 October 2011

Thursday, October 27, 2011
10:30 am EDT
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Mechanical design: Tim, Chuck
  4. PMT base design, rates, currents, amplification Beni
  5. Prototype status: Paul, Sasha
  6. Contract Status: Mark

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Tim Whitlatch, Beni Zihlmann

Review of Minutes from the Last Meeting

We went over the minutes of the October 13th meeting.

  • Chuck has been in contact with Ian Winger. Ian will send a new model of the half-width light guide.

beni,

operating at 0.02 mA no distinction between 10 and 8 stage tube 5 times less than max recommended current after 5000 hours gain down by factor of 2

checked ADC gain

have not looked at 8 stage tube yet

work on support of lightguides, phototubes

clamshell arrangement

pushing forward on holding steel still have not decided on attachment of pmt on light guide?

ask about Hall C experiment ask Bogdan about big byte

can it be arranged to have horizontal surfaces for replacement glueing

need to choose a glue to facilitate changing the phototube

need to have a design that allows replacement of tubes

now have splitters, doing measurements with all six splitters the same, takes about two weeks to do a single measurement, working with 50/50 now ill change wto 20/80

contract, can be done without complete specs