Difference between revisions of "GlueX TOF Meeting, October 25, 2012"
From GlueXWiki
m |
(→Agenda) |
||
Line 15: | Line 15: | ||
## PMT assessments of batch 1 [[http://hadron.physics.fsu.edu/wiki/index.php/GlueX_Time-of-Flight wiki]] | ## PMT assessments of batch 1 [[http://hadron.physics.fsu.edu/wiki/index.php/GlueX_Time-of-Flight wiki]] | ||
## Procurements | ## Procurements | ||
+ | ## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2109 Change request] | ||
# Calibration and Alignment | # Calibration and Alignment | ||
# Technical Design Report contribution | # Technical Design Report contribution |
Revision as of 09:39, 25 October 2012
GlueX TOF Meeting
Thursday, October 25, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- MiniTOF
- TOF Gluing Fixture
- TOF Module Wrapper
- Contract status
- PMT assessments of batch 1 [wiki]
- Procurements
- Change request
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .