==Mechanical Design==
 
==Mechanical Design==
  
 +
Chuck let us through the [https://halldweb1.jlab.org/talks/2012-2Q/mini%20tof_5_912.pptx latest drawings] for the support of the TOF modules. There has been significant progress since the last time the design was preseted. Some of the discussion:
  
 
+
* Kurt suggested independent support of soft steel shielding (curved metal pieces). Tim and Chuck will incorporate that.
independent support of curved metal that supports soft steel
+
* Cross bars on the end, connecting the the support structure at one end of the counters to the other.
 
+
* Pieces for the center-section prototype will be machined at FSU.
cross bars on the end
+
* Drawings incorporating suggested changes will be sent to the FSU team before the next meeting.
 
+
prototype will be machined at FSU
+
materials will be boutht by jlab
+
 
+
drawings will be shipped to FSU
+

Revision as of 15:39, 12 May 2012

Thursday, May 10, 2012
10:00 am EDT
JLab: CEBAF Center, F326/327

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. GlueX Collaboration Meeting Agenda
  4. Mechanical design: Tim, Chuck
  5. Prototype status: Paul, Sasha
  6. TDC choice: all
  7. Contract Status: Mark, Paul
  8. Calibration and Alignment
  9. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Chairman's Cell Phone

(757)504-0664

Minutes

Present:

  • FSU: Paul Eugenio, Kurt Koetz, Sasha Ostrovidov, Randall Smith
  • JLab: Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann

Contract

The proposal from FSU on the constuction constract has been through technical review and a report filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting. Mark has been, and will continue to, check on progress at Procurement.

PMT Purchase

The technical review committee has met and discussed proposals from vendors. A report is being prepared to send to Procurement. That should happen tomorrow.

Calibration and Alignment

Sasha has been doing some research, going through materials, doing research on what others have done for calibration. Mark suggested that we form an ad-hoc sub-committee, led by Sasha, to look at the problem.

Technical Design Report

Paul has started bringing the TOF section of the technical design report up-to-date. He remarked on the good structure of the document materials.

Mechanical Design

Chuck let us through the latest drawings for the support of the TOF modules. There has been significant progress since the last time the design was preseted. Some of the discussion:

  • Kurt suggested independent support of soft steel shielding (curved metal pieces). Tim and Chuck will incorporate that.
  • Cross bars on the end, connecting the the support structure at one end of the counters to the other.
  • Pieces for the center-section prototype will be machined at FSU.
  • Drawings incorporating suggested changes will be sent to the FSU team before the next meeting.