Difference between revisions of "GlueX TOF Meeting, June 21, 2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 11: | Line 11: | ||
# TDC choice | # TDC choice | ||
# Contract Status | # Contract Status | ||
− | # Cable labeling | + | # Cable labeling scheme |
# Calibration and Alignment | # Calibration and Alignment | ||
# Technical Design Report contribution | # Technical Design Report contribution |
Revision as of 09:06, 21 June 2012
Thursday, June 21, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- Prototype status
- TDC choice
- Contract Status
- Cable labeling scheme
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .