Difference between revisions of "GlueX TOF Meeting, June 17, 2020"
(add 6/17) |
(minutes added) |
||
Line 15: | Line 15: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2020</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2020/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2020</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2020/ . | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Present: Mark Ito (chair), Sasha Ostrovidov, Susan Schadmand, Simon Taylor | ||
+ | |||
+ | There is a [https://bluejeans.com/s/XvVhS/ recording of this meeting] on the BlueJeans site. Use your JLab credentials to gain access. | ||
+ | |||
+ | === Announcements === | ||
+ | |||
+ | Sasha has done the first set of simple tests on the 23 PMTs he has at FSU. High voltage was applied, base current measured, and signals were viewed on a scope. All look good. | ||
+ | |||
+ | Mark will check the PO to confirm the number of PMTs in the order from Hamamatsu. | ||
+ | |||
+ | === Calibration === | ||
+ | |||
+ | Beni Zihlmann has finished the energy calibration of the TOF. Constants have been uploaded to the CCDB. | ||
+ | |||
+ | === TOF NIM paper === | ||
+ | |||
+ | Sasha has the section on testing written. Mark will send out the URL of the Overleaf document so that the text can be uploaded. |
Latest revision as of 15:54, 18 June 2020
GlueX Time-of-Flight Meeting
Wednesday, June 17, 2020
10:00 am EDT
BlueJeans: 350 531 998
Agenda
- Announcements
- Review of minutes from the last meeting
- Calibration
- TOF NIM paper
- Action Item Recap
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2020
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2020/ .
Minutes
Present: Mark Ito (chair), Sasha Ostrovidov, Susan Schadmand, Simon Taylor
There is a recording of this meeting on the BlueJeans site. Use your JLab credentials to gain access.
Announcements
Sasha has done the first set of simple tests on the 23 PMTs he has at FSU. High voltage was applied, base current measured, and signals were viewed on a scope. All look good.
Mark will check the PO to confirm the number of PMTs in the order from Hamamatsu.
Calibration
Beni Zihlmann has finished the energy calibration of the TOF. Constants have been uploaded to the CCDB.
TOF NIM paper
Sasha has the section on testing written. Mark will send out the URL of the Overleaf document so that the text can be uploaded.