Difference between revisions of "GlueX TOF Meeting, January 19, 2012"
(→Communication) |
(notes as minutes) |
||
Line 24: | Line 24: | ||
==Chairman's Cell Phone== | ==Chairman's Cell Phone== | ||
− | + | (757)504-0664. | |
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Notes | ||
+ | |||
+ | 1/19/12 | ||
+ | |||
+ | tim chuck eugene beni mark | ||
+ | paul sasha | ||
+ | |||
+ | to do | ||
+ | |||
+ | • look evo meeting info for tof, there was a meeting booked | ||
+ | • update the meeting page with this info | ||
+ | • circulate quotes | ||
+ | ∘ electron tube | ||
+ | ∘ phillips amplifier | ||
+ | • procurement status | ||
+ | • | ||
+ | |||
+ | minutes | ||
+ | |||
+ | • look at amplifiers to be ready if needed | ||
+ | • look at 8-stage tubes | ||
+ | • | ||
+ | |||
+ | meeting with design enineers on lighjt guides, chuck fsu guys | ||
+ | • add 1 cm flat pices like for larger light guides | ||
+ | • reduce length by 4 cm | ||
+ | • get a new design by monday | ||
+ | • another meeting tue 9 am | ||
+ | • chuck paul, kurt, ian, randall | ||
+ | |||
+ | |||
+ | contract | ||
+ | • starting on construction documentation | ||
+ | |||
+ | prototype | ||
+ | |||
+ | • replkaced a trigger pmt | ||
+ | • time resolution 98 ps | ||
+ | • get 90 ps in center of counter | ||
+ | • speed of light as function of tube | ||
+ | ∘ use source, measure time as function position | ||
+ | |||
+ | constrution | ||
+ | • example of latest light guide in hand | ||
+ | • structure for gluing three modules at a time | ||
+ | ∘ ian is work on it | ||
+ | ∘ | ||
+ | ∘ |
Revision as of 14:57, 19 January 2012
Thursday, January 19, 2012
10:00 am EST
JLab: CEBAF Center, Room F326
Contents
Agenda
- Announcements
- Minutes from the last meeting
- Mechanical design: Tim, Chuck
- Prototype status: Paul, Sasha
- Contract Status: Mark
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-1Q/ .
Chairman's Cell Phone
(757)504-0664.
Minutes
Notes
1/19/12
tim chuck eugene beni mark paul sasha
to do
• look evo meeting info for tof, there was a meeting booked • update the meeting page with this info • circulate quotes ∘ electron tube ∘ phillips amplifier • procurement status •
minutes
• look at amplifiers to be ready if needed • look at 8-stage tubes •
meeting with design enineers on lighjt guides, chuck fsu guys • add 1 cm flat pices like for larger light guides • reduce length by 4 cm • get a new design by monday • another meeting tue 9 am • chuck paul, kurt, ian, randall
contract
• starting on construction documentation
prototype
• replkaced a trigger pmt • time resolution 98 ps • get 90 ps in center of counter • speed of light as function of tube ∘ use source, measure time as function position
constrution • example of latest light guide in hand • structure for gluing three modules at a time ∘ ian is work on it ∘ ∘