Difference between revisions of "GlueX TOF Meeting, January 17, 2013"
From GlueXWiki
(copy of last time) |
(adjusted) |
||
Line 1: | Line 1: | ||
GlueX TOF Meeting<br> | GlueX TOF Meeting<br> | ||
− | Thursday, | + | Thursday, January 17, 2013<br> |
− | 10:00 am | + | 10:00 am EST<br> |
− | JLab: CEBAF Center, | + | JLab: CEBAF Center, L207<br> <!-- F326 room reservation good through 6/20/2013 --> |
=Agenda= | =Agenda= | ||
# Announcements | # Announcements | ||
− | # Review of [[GlueX TOF Meeting, December | + | # Review of [[GlueX TOF Meeting, December 20, 2012#Minutes|last TOF bi-weekly meeting]] |
# Mechanical design | # Mechanical design | ||
− | |||
− | |||
− | |||
− | |||
# Contract status | # Contract status | ||
# Calibration and Alignment | # Calibration and Alignment | ||
# Technical Design Report contribution | # Technical Design Report contribution | ||
+ | |||
+ | =References= | ||
+ | |||
+ | # [http://hadron.physics.fsu.edu/wiki/index.php/MiniTOF MiniTOF] | ||
+ | # [http://hadron.physics.fsu.edu/wiki/index.php/GluingStructure TOF Gluing Fixture] | ||
+ | # [http://hadron.physics.fsu.edu/wiki/index.php/GlueX_Time-of-Flight PMT testing] | ||
=Communication= | =Communication= | ||
Line 22: | Line 24: | ||
# '''ESNet''': 8542553 | # '''ESNet''': 8542553 | ||
− | # '''EVO''': [http:// | + | # '''EVO''': [http://research.seevogh.com/ SeeVogh site] |
#* [http://research.seevogh.com/join?meeting=ete8eavBvDauaeIlaiIt meeting link] <!-- This link is good through 2013-11-21 --> | #* [http://research.seevogh.com/join?meeting=ete8eavBvDauaeIlaiIt meeting link] <!-- This link is good through 2013-11-21 --> | ||
#* Phone bridge ID: 15 1627 | #* Phone bridge ID: 15 1627 | ||
Line 28: | Line 30: | ||
==Slides== | ==Slides== | ||
− | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/ | + | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2013-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ . |
Revision as of 20:49, 16 January 2013
GlueX TOF Meeting
Thursday, January 17, 2013
10:00 am EST
JLab: CEBAF Center, L207
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- Contract status
- Calibration and Alignment
- Technical Design Report contribution
References
Communication
Videoconference
- ESNet: 8542553
- EVO: SeeVogh site
- meeting link
- Phone bridge ID: 15 1627
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .