==Construction Status==
 
TOF Meeting Notes
 
TOF Meeting Notes
  
 
students hired and working
 
students hired and working
 +
 +
===ESR material===
 
esr material, now have received a roll of esr material
 
esr material, now have received a roll of esr material
 
not 3x2 ft sheets.
 
not 3x2 ft sheets.
Line 56: Line 59:
 
thickness of esr about 2 mils. 8" by 1000 ' roll
 
thickness of esr about 2 mils. 8" by 1000 ' roll
  
light guide
+
===Light Guide Manufacturing===
 +
light guide 90% partially milled, 25% milled, 10% pollished
 
another month for machining of all the light guides
 
another month for machining of all the light guides
 
next week build first article moduels to put inside the mini-tof
 
next week build first article moduels to put inside the mini-tof
 +
 +
===Scintillator Purchase===
 +
 
received scintillator for first article, six modules
 
received scintillator for first article, six modules
 
communication with Eljen about remaining scintillators
 
communication with Eljen about remaining scintillators
they have a dozen short by 1/8"  
+
The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
 +
 
 +
Paul suggests we approve request
 +
 
 +
 
 
we decided to accept short module from eljen since the support structure should be able to accomodate  
 
we decided to accept short module from eljen since the support structure should be able to accomodate  
 +
 +
===Mini-TOF Construction===
  
 
minitof, constrcut 1st article by next week, by next meeting have photos of things inside minitof
 
minitof, constrcut 1st article by next week, by next meeting have photos of things inside minitof
 
support structure is done
 
support structure is done
 
+
    assembly on sawhorses
end of feb for readiness review
+
    mount on rotating support stand
  
 
pmt
 
pmt
Line 86: Line 99:
 
contgracdt
 
contgracdt
 
readynes review
 
readynes review
 +
end of feb for readiness review
 +
 
invoiceing form
 
invoiceing form
 
review meeting 1 hour with procurements folks
 
review meeting 1 hour with procurements folks
Line 91: Line 106:
 
way to map into evms, track costs as reflected in evmns vs invoices.
 
way to map into evms, track costs as reflected in evmns vs invoices.
  
tdr still out there
+
==calibration and alignment==
 +
, g note still in the works
 +
==tdr==
 +
 
 +
still out there
  
  

Revision as of 16:29, 17 January 2013

GlueX TOF Meeting
Thursday, January 17, 2013
10:00 am EST
JLab: CEBAF Center, L207

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Construction status
    1. ESR material has arrived at FSU
    2. Scintillator purchase
      1. The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
      2. I suggest we approve request
    3. Light Guide manufacturing: 25% completed, 90% partially milled, 25% milled, 10% pollished
    4. Plan to assemble 1st articles modules next week.
    5. completed MiniTOF support structure built
      1. assembly on sawhorses
      2. mount on rotating support stand
  4. Contract status
  5. Calibration and Alignment
  6. Technical Design Report contribution

References

  1. MiniTOF
  2. TOF Gluing Fixture
  3. PMT testing

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: SeeVogh site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Tim Whitlatch, Beni Zihlmann

Construction Status

TOF Meeting Notes

students hired and working

ESR material

esr material, now have received a roll of esr material not 3x2 ft sheets. original came with adhesive, before stuck to tedlar no adhesive on the roll, thickness will be less, will send to chuck thickness of esr about 2 mils. 8" by 1000 ' roll

Light Guide Manufacturing

light guide 90% partially milled, 25% milled, 10% pollished another month for machining of all the light guides next week build first article moduels to put inside the mini-tof

Scintillator Purchase

received scintillator for first article, six modules communication with Eljen about remaining scintillators

The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"

Paul suggests we approve request


we decided to accept short module from eljen since the support structure should be able to accomodate

Mini-TOF Construction

minitof, constrcut 1st article by next week, by next meeting have photos of things inside minitof support structure is done

    assembly on sawhorses
   mount on rotating support stand 

pmt yesterday received the final shipment all have arrived major disaster, computer died, yesterday revived. 1. led to measure gains 2. americium, 100 pmt's done 3. cesium iodide source, spectrum analyzer, 60 pmt's done 4. noise measurements, none done recieved CAEN module scintillator strontium source lead collimator, mounted Sr source, taken away

assessing the bar, move source to a few locations, next week bar ready to attach light guides

contgracdt readynes review end of feb for readiness review

invoiceing form review meeting 1 hour with procurements folks standard invoiocing procedure way to map into evms, track costs as reflected in evmns vs invoices.

calibration and alignment

, g note still in the works

tdr

still out there


<end of note>