### The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8" | ### The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8" | ||
### I suggest we approve request | ### I suggest we approve request | ||
− | ## Light Guide manufacturing 25% completed, 90% partially milled, 25% milled, 10% pollished | + | ## Light Guide manufacturing: 25% completed, 90% partially milled, 25% milled, 10% pollished |
# Contract status | # Contract status | ||
# Calibration and Alignment | # Calibration and Alignment |
Revision as of 10:50, 17 January 2013
GlueX TOF Meeting
Thursday, January 17, 2013
10:00 am EST
JLab: CEBAF Center, L207
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Construction status
- MiniTOF support structure built
- ESR material has arrived at FSU
- Scintillator purchase
- The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
- I suggest we approve request
- Light Guide manufacturing: 25% completed, 90% partially milled, 25% milled, 10% pollished
- Contract status
- Calibration and Alignment
- Technical Design Report contribution
References
Communication
Videoconference
- ESNet: 8542553
- EVO: SeeVogh site
- meeting link
- Phone bridge ID: 15 1627
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .