Difference between revisions of "GlueX TOF Meeting, February 18, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
(Minutes)
Line 37: Line 37:
 
=Minutes=
 
=Minutes=
  
TOF Meeting, 2/18
+
Present:
 
+
* '''FSU''': Paul Eugenio
JLab: Mark, Tim, Sascha, Simon, Tim, Beni, Elton, Yi
+
* '''JLab''': Mark Ito (chair), Yi Qiang, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Beni Zihlmann
FSU:
+
  
 
Test says PMT is as advertised, better than intrinsic.  
 
Test says PMT is as advertised, better than intrinsic.  

Revision as of 12:05, 22 February 2011

Location, Time

Friday, February 18, 2011
2:00 pm EST
JLab: CEBAF Center, Room F326/7

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Report from trip to U. of South Carolina: Paul
  4. Prototype Status
  5. Contract Status
  6. TOF Schedule
  7. Meeting time OK?

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .

Minutes

Present:

  • FSU: Paul Eugenio
  • JLab: Mark Ito (chair), Yi Qiang, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Beni Zihlmann

Test says PMT is as advertised, better than intrinsic.

Trip to SC to see Ralf

• good trip, with sasha • goals ∘ on design choices, compare and contrast ∘ resolution not at goal ∘ ESR beneficial or not • went over their procedures • time-walk corrections ∘ sasha trying to fit all parameters at once ∘ sc using iterative approach, not letting all parameters float ∘ without time walk corrections, factor of two worse ∘ Elton 1/sqrt(ph) not the right functional dependence ∘ laser might have different spectral response • TDC's ∘ resolution from electronics get something like 55 ps, the least significant bit ∘ Ralf gets the same thing, lsb value, except 25 ps from his CAEN device ∘ Why not go to CAEN TDC. ∘ will get from Mark Kibilko ∘ readout protocol should be OK • PMT choices ∘ SC using 8 stage, not the 10 stage ∘ 10 stage tube perhaps not available • ESR ∘ improved light collection results from FSU ∘ SC had poorer performance with ESR ∘ material they were calling ESR, looks like white Tedlar, not specular ∘ Ralf had mylar that he could not use and gave it to Paul • tour of lab ∘ alignment devices ∘ glueing tools, jigs • Contract ∘ assembly and testing document

Geometry

• making the counters wider may lose light • mounting pmt directly on scint like SC attractive • has not finalized proposal yet • need to talk about it next time • outside diameter with mu metal 6 cm • sc using 6 cm x 6cm counters • current design with steel tube more than adequate


schedule • tim shows one • pmt kind of thing JLab would buy • scint as well • others bought by FSU • contract has to be awarded PO goes out, 7 months from now


mu metal shield will be tested

rates for innermost paddles near the beam hole: how do we address that



get drawing from tim on