=Minutes=
 
=Minutes=
  
Start Counter Notes, 9/20/12
+
Present:
  
eric access to ifarm
+
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
halld wiki
+
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair)
halld work disk
+
 
+
username pooser
+
 
+
coda recommended distributribution for linux
+
  
 
material at mcneal
 
material at mcneal
Line 45: Line 40:
 
test done before with a pulsed led directly on the sipm detector
 
test done before with a pulsed led directly on the sipm detector
  
[when doe sipm's arrive]
+
[when do sipm's arrive]
  
[actiion items from last meeting]
+
[action items from last meeting]
  
 
Eric mechanical assembly ideas
 
Eric mechanical assembly ideas
  
eric, puneet, werner
 
chuck, eugene, mark
 
  
 
hold with shrink wrap
 
hold with shrink wrap

Revision as of 16:43, 21 September 2012

GlueX Start Counter Meeting
Thursday, September 20, 2012
10 am EDT
JLab: CEBAF Center F326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Presentation at the Collaboration Meeting
  4. Mechanical Design
  5. Read-out Design
  6. Simulation
  7. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair)

material at mcneal order for 3 paddles has been placed as in final design, if good can be used currently setting up for connecting sipm readout from fernando to a real scintillator paddle test done before with a pulsed led directly on the sipm detector

[when do sipm's arrive]

[action items from last meeting]

Eric mechanical assembly ideas


hold with shrink wrap or silicon tape, can be undone later

horizontal orientation envisioned

nim article, long thin scintillators, output as funcction of position not mucninthe lierature right now

schedule, changed values, mechanical device, keep for servicing, discuss with Lei talk to mcneal

chuck will send model,

assembly plan

review budget consult Tim