Difference between revisions of "GlueX Start Counter Meeting, September 20, 2012"
(notes as minutes) |
|||
Line 26: | Line 26: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Start Counter Notes, 9/20/12 | ||
+ | |||
+ | eric access to ifarm | ||
+ | halld wiki | ||
+ | halld work disk | ||
+ | |||
+ | username pooser | ||
+ | |||
+ | coda recommended distributribution for linux | ||
+ | |||
+ | material at mcneal | ||
+ | order for 3 paddles has been placed | ||
+ | as in final design, if good can be used | ||
+ | currently setting up for connecting sipm readout from fernando to a real scintillator paddle | ||
+ | test done before with a pulsed led directly on the sipm detector | ||
+ | |||
+ | [when doe sipm's arrive] | ||
+ | |||
+ | [actiion items from last meeting] | ||
+ | |||
+ | Eric mechanical assembly ideas | ||
+ | |||
+ | eric, puneet, werner | ||
+ | chuck, eugene, mark | ||
+ | |||
+ | hold with shrink wrap | ||
+ | or silicon tape, can be undone later | ||
+ | |||
+ | horizontal orientation envisioned | ||
+ | |||
+ | nim article, long thin scintillators, output as funcction of position | ||
+ | not mucninthe lierature right now | ||
+ | |||
+ | schedule, changed values, mechanical device, keep for servicing, | ||
+ | discuss with Lei | ||
+ | talk to mcneal | ||
+ | |||
+ | chuck will send model, | ||
+ | |||
+ | assembly plan | ||
+ | |||
+ | review budget | ||
+ | consult Tim |
Revision as of 13:46, 21 September 2012
GlueX Start Counter Meeting
Thursday, September 20, 2012
10 am EDT
JLab: CEBAF Center F326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Presentation at the Collaboration Meeting
- Mechanical Design
- Read-out Design
- Simulation
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct meeting link
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .
Minutes
Start Counter Notes, 9/20/12
eric access to ifarm halld wiki halld work disk
username pooser
coda recommended distributribution for linux
material at mcneal order for 3 paddles has been placed as in final design, if good can be used currently setting up for connecting sipm readout from fernando to a real scintillator paddle test done before with a pulsed led directly on the sipm detector
[when doe sipm's arrive]
[actiion items from last meeting]
Eric mechanical assembly ideas
eric, puneet, werner chuck, eugene, mark
hold with shrink wrap or silicon tape, can be undone later
horizontal orientation envisioned
nim article, long thin scintillators, output as funcction of position not mucninthe lierature right now
schedule, changed values, mechanical device, keep for servicing, discuss with Lei talk to mcneal
chuck will send model,
assembly plan
review budget consult Tim