Difference between revisions of "GlueX Start Counter Meeting, November 3, 2011"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
(Minutes)
Line 33: Line 33:
 
* '''JLab''': Chuck Hutton, Mark Ito (chair), Beni Zihlmann
 
* '''JLab''': Chuck Hutton, Mark Ito (chair), Beni Zihlmann
  
 +
==MOU==
 +
 +
The MOU has been signed by all parties at FIU and at JLab and is thus official! The FIU copy on the way back to Werner.
 +
 +
==Plastic Craft Pieces==
 +
 +
The scintillator samples were sent back to Plastic Craft for re-polishing. No word yet from them on progress.
 +
 +
==Mechanical Design==
 +
 +
Eric showed several views of possible positions for the 4x4 SiPM arrays with respect to the start counter. See
 +
???view 1,
 +
view 2,
 +
view 3,
 +
view 4,
 +
and view 5.
 +
 +
We also discussed other arrangements
 +
 +
* '''two counters into one 4x4 array'''. This is the arrangement that Fernando Barbosa suggested as a possiblity. Each counter would be directed into a 2x4 sub-array of the 4x4 array being used by the BCAL. Each sub-array would be electrically independent, i. e., have a different summing circuit than that for the BCAL SiPM's. Fernando thought design of the accompanying pre-amp would not be difficult. No need to stagger the SiPM's in this case.
 +
* '''array that matches the start counter'''. Werner and Elton (independently) mentioned having an array that matches the area of the counters better, say 1x5 or 2x4. This would simplify the shape of the light guides and could fit without staggering.
 +
2x4 array
 
MOU  
 
MOU  
  

Revision as of 14:55, 3 November 2011

10 am EDT
JLab: CEBAF Center, Room F326/7

Agenda

  1. Announcements
  2. Review minutes from previous meeting: all
  3. Prototype Report
  4. SiPM configuration
    1. staggered 4x4 arrays
    2. two counters into one 4x4 array
    3. 2x4 arrays
  5. MOU status
  6. Simulation Status [1]

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ . You have to be a member of the "halld" Unix group to put files in this directory.

Minutes

Present:

  • FIU: Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser
  • JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann

MOU

The MOU has been signed by all parties at FIU and at JLab and is thus official! The FIU copy on the way back to Werner.

Plastic Craft Pieces

The scintillator samples were sent back to Plastic Craft for re-polishing. No word yet from them on progress.

Mechanical Design

Eric showed several views of possible positions for the 4x4 SiPM arrays with respect to the start counter. See ???view 1, view 2, view 3, view 4, and view 5.

We also discussed other arrangements

  • two counters into one 4x4 array. This is the arrangement that Fernando Barbosa suggested as a possiblity. Each counter would be directed into a 2x4 sub-array of the 4x4 array being used by the BCAL. Each sub-array would be electrically independent, i. e., have a different summing circuit than that for the BCAL SiPM's. Fernando thought design of the accompanying pre-amp would not be difficult. No need to stagger the SiPM's in this case.
  • array that matches the start counter. Werner and Elton (independently) mentioned having an array that matches the area of the counters better, say 1x5 or 2x4. This would simplify the shape of the light guides and could fit without staggering.

2x4 array MOU

shipped back, not received back yet, no word on progress yet

drawings 1) two different light guides possibly different responses